Developments machine
Car accessories
Rolling Machine Tool
Original product


 

  UserName:
  @cnlanyue.com
 
  PassWord
 

 

 
 

Index>>Product world

 
Product world -> Developments machine -> Formwork
Hydraulic Lifting formwork project working schematics
1、Bind steel at the original floor according to the height of the floor.Install the climbing-Form.It is held up by the sub comcrete pre-buried pant and the floor
2、Irrigate and build concrete in the customed way and maintain.During this period,bind the up-floor steel remove the piercing-bolt after the comcrete.Reach the strength of stripping form,Reteat formwork for 80mm
3、the back stop of the jack drop at the roof of the concrete,when the concrete strength reach 10Mpa and above climbing form start to climb.Bind steel and climb at the same time.
4、Join the basement of lifting set and pre-buried bolt,when the bottom of formwork reach designated height of the up-floor,fix the returning formword tightly.The floor is under construction.
Hydraulic sliding Formwork are widely used in buildings working.The jack of QYDS-100(Patent NO.ZL 2004 2 0080879.7)thet adopts the company to develop exclusively can carry out the building plank and wall of whole sprinkle to note.The highest storey of Europe,341 metres height and 87 floors Russian Federal Bulding use the hydraulic sliding word that our company produces.
 

 

Index About us News Principle Products Network Culture Club Personnel Contact us

Jiangdu Lanyue Machinery Co.,Ltd

Technique support: LongZheng network

Tel:0514-86553231 86552252 86856083  Fax:0514-86553281       EMAIL:zzm@cnlanyue.com