Hydraulic Lifting formwork project working schematics
1、Bind
steel at the original floor according to the height
of the floor.Install the climbing-Form.It is held up
by the sub comcrete pre-buried pant and the floor
2、Irrigate and build concrete in the customed way and
maintain.During this period,bind the up-floor steel
remove the piercing-bolt after the comcrete.Reach the
strength of stripping form,Reteat formwork for 80mm
3、the back stop of the jack drop at the roof of the
concrete,when the concrete strength reach 10Mpa and
above climbing form start to climb.Bind steel and climb
at the same time.
4、Join the basement of lifting set and pre-buried bolt,when
the bottom of formwork reach designated height of the
up-floor,fix the returning formword tightly.The floor
is under construction.
Hydraulic
sliding Formwork are widely used in buildings working.The
jack of QYDS-100(Patent NO.ZL 2004 2 0080879.7)thet
adopts the company to develop exclusively can carry
out the building plank and wall of whole sprinkle to
note.The highest storey of Europe,341 metres height
and 87 floors Russian Federal Bulding use the hydraulic
sliding word that our company produces.